Subscribe to FOSA News

400 kV Power Cable Circuit Monitoring

EWA is the Electricity and Water Authority in Bahrain, focused on providing a quality, reliable electrical and water supply for sustainable development of the Kingdom of Bahrain. AP Sensing was recently selected to monitor a 400 kV power cable loop for EWA….includes a subsea section, and is monitored from both ends of the circuit….a crucial link to the infrastructure of the Kingdom of Bahrain and is the first 400 kV XLPE submarine cable to be installed in the Gulf Cooperation Council…Two N4425A AP Sensing Distributed Temperature Sensing (DTS) devices were deployed
400 kV Power Cable Circuit Monitoring
AP Sensing Case Study February 9, 2022
Read the Case Study

Recent Stories
FOSA AND FIBER OPTIC APPLICATIONS FOR PIPELINING WITH JJ WILLIAMS & ALEX DE JOODE

Leak Detection in Wells on the Use of Distributed Temperature Gradient Sensing with DAS FEBUS A1

FOSA Public Policy Committee engaged with House and Senate Committee